Crossrail

05.03.18

DfT launches Crossrail 2 affordability review to ensure value for money

Chris Grayling has announced an independent review to ensure the affordability of Crossrail 2.

Speaking at the Transport for the Northern Powerhouse conference in Leeds last Friday, the transport secretary explained that the Independent Affordability Review, commissioned jointly by the DfT and TfL, has been established to ensure that Crossrail 2 demonstrates value for money to the taxpayer.

The review will focus on the affordability of the project, ensuring that it learns from the best practice exhibited by other projects such as Crossrail, and that those who stand to benefit from the scheme contribute to funding it.

The review will be led by Mike Gerrard, former managing director of Thames Tideway Tunnel.

“Crossrail 2 has the potential to relieve congestion and unlock housing, jobs and development to support future growth in London, but it is imperative that it can be delivered in an affordable way that is fair to both the London public and the wider UK taxpayer,” Gerrard explained.

“Major projects work best when independent reviews, drawing on a wealth of experience, help move them from plans to spades in the ground.

“I am delighted to chair this crucial review and I look forward to working with the DfT and TfL to ensure that Crossrail 2 is the best project it can be.”

Mike Brown, London’s transport commissioner, added: “We welcome the government’s backing for infrastructure projects of national importance such as Crossrail 2 and are pleased to be working with the DfT on the Independent Affordability Review led by Mike Gerrard.

“This is an important step forward for a project that is vital for London, as reflected in the Mayor’s Transport Strategy, and for the whole of the south-east region.”

The review is expected to conclude in summer 2018.

Top image: Transport for London Press Images

Have you got a story to tell? Would you like to become an RTM columnist? If so, click here.

Comments

Andrew Gwilt   05/03/2018 at 13:57

I presume that Crossrail 2 will start in 2020/21 and to be completed by around 2027/28. As Crossrail 1 (Elizabeth Line) is set to open in May and December this year and next year. With Class 345’s soon to operate between Paddington-Reading and Heathrow Airport and between Whitechapel and Abbey Wood with the central section between Whitechapel and Paddington to open next year. As TfL Rail Class 345’s are currently operating between Liverpool St and Shenfield.

Lutz   05/03/2018 at 16:46

No; The targets will most likely be missed on CR2 - this has been covered previously - TfL will need to schedule public consultations after the various reviews have been completed, and will need to come up with a mutually satisfactory funding proposal.

James Miller   05/03/2018 at 20:44

As someone who was deeply involved in project management, I always wonder, if the functionality of Crossrail 2 can be created by developing a series of sub-projects. 1. Four-track the West Anglia Main Line. 2. Terminate a proportion of West Anglia trains in the High Meads Loop at Stratford. 3. Put modern trains on the Piccadilly Line. 4. Extend the DLR to Euston and St. Pancras. 5. Extend the Bakerloo Line 6. Increase Waterloo suburban services to Crossrail 2 levels.,I think it is possible with 100 mph trains and the increased Waterloo capacity. 7. Upgrade Oxford Circus, Highbury and Islingtojn and Walthamstow Central stations. Only, when you've increased capacity elsewhere would you dig the expensive central tunnel.

Noam Bleicher   06/03/2018 at 10:15

James, some of your proposals make sense, but I'm afraid I have to take issue with the last two. The whole point of big RER-style under-city rail lines like this is to relieve pressure on large vity rail termini like Waterloo, and on overcrowded complex metro interchanges like Oxford Circus. Yes it's expensive, but really sometimes the only way to achieve all the objectives you're suggesting is to do it in one big project.

Noam Bleicher   06/03/2018 at 10:17

Whatever else they build, can they please start by building the 'Euston Cross' interchange?? It is the only way in the foreseeable future that meaningful interchange will be possible between HS1 and HS2, by some kind of travellator link between Euston and St Pancras.

Add your comment

 

related

rail technology magazine tv

more videos >

latest rail news

TfL reveals ultramodern London Overground trains

21/06/2018TfL reveals ultramodern London Overground trains

Brand new state-of-the-art London Overground electric trains have been unveiled to the public, hosting Wi-Fi and USB charging capabilities a... more >
Rail companies launch plan to deliver £9.2bn economic benefit to south east

20/06/2018Rail companies launch plan to deliver £9.2bn economic benefit to south east

Rail companies have come together to launch a long-term plan for the railway in south east London and Kent. The region’s rail companies, s... more >
Anger as Northern Rail routes ‘not really valued’ by ministers and DfT

20/06/2018Anger as Northern Rail routes ‘not really valued’ by ministers and DfT

Department for Transport officials and ministers were warned about Northern Rail chaos two years ago, but saw some key routes as “not reall... more >

editor's comment

23/01/2018Out with the old...

Despite a few disappointing policy announcements, especially for the electrification aficionados amongst us, 2017 was, like Darren Caplan writes on page 20, a year generally marked by positive news for the rail industry. We polished off the iconic Ordsall Chord (p32), hit some solid milestones on Thameslink (p40), progressed on ambitious rolling stock orders (p16), and finally started moving forward on HS2 (p14) ‒ paving the way for a New Ye... read more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

How biometrics can help improve health and safety measures on railway construction projects

20/03/2018How biometrics can help improve health and safety measures on railway construction projects

ADVERTISEMENT FEATURE Biometric identity, time and attendance specialists Donseed looks at how biometric technology is already starting to enhance health and safety measures on railway construction projects. Advances in technology are starting to transform the way in which the rail network in the UK is managed, operated and maintained.... more >
read more blog posts from 'the sleeper' >

comment

Apprenticeship levy: the latest picture

05/06/2018Apprenticeship levy: the latest picture

Mark Holmes, head of membership and development at NSAR, describes the current resources available to the rail industry to ensure companies of al... more >
Moving in the right direction

05/06/2018Moving in the right direction

Alex Cropper, head of projects group at Transport for Greater Manchester (TfGM), reports on the exciting progress so far in building the Trafford... more >
Overcoming leaves on the line

05/06/2018Overcoming leaves on the line

Paul Gray, professional lead of engineering R&D at the RSSB, explains how latest research proves using double variable rate sanders on trains... more >
Rail: A woman’s world

18/05/2018Rail: A woman’s world

RTM’s Sacha Rowlands reports from a panel debate where six of the industry’s leading figures convened to discuss the fundamental issu... more >

rail industry focus

View all News

interviews

Transforming travel in the north west

06/02/2018Transforming travel in the north west

RTM’s Josh Mines talks to Robin Davis, head of new trains at TransPennine Express (TPE), about the huge rolling stock change journey the co... more >