Extra 9km tunnels proposed for HS2
24.04.13:
HS2 Ltd has modified plans for the route through London, to cut 15 months off the construction time.
Following lobbying by local residents, the company has proposed to include extra 9km twin-bored tunnels under Ealing and Northolt. The cont...