London Underground and TfL

11.08.17

Khan pledges full 4G coverage across Underground by 2019

Mayor of London Sadiq Khan has today set out ambitions to deliver 4G connectivity across the London Underground in stations and tunnels from 2019.

He also stated that he was already looking into “futureproofing” the network so that it can ready itself for 5G connectivity as well.

Discussing the issue in a letter sent to 33 London councils, Khan took the opportunity to invite the local authorities to prepare bids for a Challenge Fund designed to boost fibre connectivity across the capital.

The announcement confirms an RTM news story from May that explained TfL was moving forward on measures to improve its mobile coverage on the tube.

In his letter, the mayor also stated that the Elizabeth Line will have mobile connectivity when it launches through central London in 2018, giving passengers continuous phone coverage and access to the internet as trains move through tunnels across the network.

TfL will issue a formal notice soon seeking feedback from the industry on how Underground and street-level assets can be best used to improve connectivity across the capital and also generate a commercial return.

“London is now a leading global tech hub, with thriving start-ups alongside major companies like Facebook, Amazon and Google,” Khan commented.

“But our digital connectivity needs to be improved – internet connectivity is now a key public utility, and it is no surprise that some businesses see poor connectivity as a barrier to growth.”

The mayor also explained that if London was to remain competitive in the global economy, it needed to ensure every resident was able to access a fast and reliable digital connection.

“That means working to boost connectivity across London – tackling not-spots, delivering connectivity in the London Underground and working with local authorities to provide digital infrastructure fitting of a global tech hub,” he concluded.

And David Leam, infrastructure director at London First, added: “Business needs fast and reliable connections across our capital – in the office, for people working from home and when they’re on the move.

“We should be making the most of existing infrastructure, including the London Underground network, to boost speeds and deliver coverage to areas that have been left behind. But we also need London’s planners to get behind this work, otherwise our digital ambitions risk being strangled by red tape.”

Comments

Andrew Gwilt   11/08/2017 at 23:42

I like the idea of 4G to be introduced across the London Underground.

Add your comment

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the Wessex route in the South o... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passengers in the West Midlands.... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across t... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >