Three companies have been fined a total of £300,000 for safety breaches that led to a runaway engineering train in 2010. The ORR has brought a prosecution against London Underground, Tube Lines and Schweerbau for their failure to effectively co-ordinate, plan and work together in transporting the damaged train.

On Friday 13 August 2010, a broken-down engineering train was being towed uphill towards Highgate tube station when a connection failed and the train broke free. The train ran downhill out of control, southbound on the London Underground Northern line for 16 minutes and over four miles.

The train reached speeds of up to 30mph and passed through seven populated stations before it eventually came to an unaided stop caused by an uphill incline on the approach to Warren Street station.

The companies have also been ordered to pay costs of £44,074.

Ian Prosser, ORR’s director of safety, said: “London Underground, Tube Lines and Schweerbau, through inadequate management and planning, failed to ensure the safe recovery of an engineering train.

“This is clearly unacceptable, and led to a potentially catastrophic incident on the Northern Line where the train careered out of control for over four miles. It was only the professionalism of control room staff taking decisive action which prevented a collision between trains, and averted a much more serious outcome.

“The regulator will continue to closely monitor the actions of all parties involved, and will not hesitate to step in should further safety failings be found.”

Bob Crow, RMT general secretary, said: “This shocking incident, which could very easily have resulted in a major tragedy and loss of life as the runaway grinder hurtled after a passenger train, should continue to serve as a wake-up call to London Underground and Boris Johnson nearly two and half years on.

“The reports of what happened on that day will still send a shiver down the spine of tube users and no one should underestimate the role played by a fast-acting tube driver in saving lives as the grinder chased behind the train. Against that background the dangerous talk of driverless operation should stop right now.”

Tell us what you think – have your say below, or email us directly at [email protected]

(Library image)

Comments

There are no comments. Why not be the first?

Add your comment

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the Wessex route in the South o... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passengers in the West Midlands.... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across t... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >