Track and signalling

06.06.17

Guidance published to manage risk of signalling transitions for drivers

Guidance has been released this week to help the rail industry prepare drivers for transitions between Class B (AWS and TPWS) and ETCS (European Train Control System) signalling systems.

In research released yesterday, the RSSB interviewed drivers who transition between different signalling systems and found that that though training prepared them well for routes, the increasing number of transitions coupled with drivers being placed in areas of high complexity or degraded operations risked creating confusion on which train protection system was active.

This latest guidance is designed to mitigate risk, and sets out a hazard identification and risk assessment process to assist TOCs with helping drivers with signalling transitions.

The steps of the process are defining the system, assessing risks after mitigation, monitoring effectiveness of risk control measures and a residual risk assessment.

These recommendations are also being implemented into the ERTMS (European Railway Traffic Management System) roll out programme, and it is hoped that the research will ensure risk at transitions is better understood, and allow transition design teams to identify potential issues for drivers.

The RSSB said that the research will support infrastructure managers in re-evaluating the risks in existing transition designs.

“The roll-out of ERTMS in the UK has the potential to expose drivers to transitions between ERTMS Level 2 and conventional Class B AWS/TPWS signalling operations during a journey or a work shift,” the abstract of the RSSB’s research reads.

“After the transition, there may be a period of adjustment before the driver is completely secure in the new method of operation,” it continues. “During this adjustment period, there is potential for degradation in the effectiveness of the driving task; for example, in speed management or, interpretation of and reaction to signal aspects. This may impact on performance and safety.

“This research has considered a number of transition related issues including: key risks and scenarios to be managed, the time it takes a driver to adapt to a new signalling system, the effect of the number and frequency of transitions, and the potential impact of transition borders near to infrastructure features that impact on driver workload.”

Have you got a story to tell? Would you like to become an RTM columnist? If so, click here  

Comments

There are no comments. Why not be the first?

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the Wessex route in the South o... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passengers in the West Midlands.... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >