Inbox

20.07.15

Scotsman loco will return in full steam this year

The historic Flying Scotsman locomotive might return to main line service by the end of this year as part of a £4m restoration project that has lasted over a decade.

Riley & Son Ltd, a Bury-based specialist engineering firm, is now in the final stages of the most complex restoration of a steam locomotive ever undertaken – with its overhaul starting after the engine was brought to York’s National Railway Museum in 2004 for £2.3m.

Now the steam engine is being fitted with necessary equipment to operate on main line railways in an effort to start trials before the end of 2015. This includes fitting a train monitoring recorder and TPWS equipment (the train protection and warning system).

Colin Green, Riley’s co-director, said: “We have come through all the critical milestones for a locomotive restoration and although there is a lot of work still to get through and parts to fit, there is nothing significant standing in the way of Scotsman coming back to steam.”

The locomotive was built in early 1923 after designs by Sir Nigel Gresley. It was originally built in Doncaster for the London and North Eastern Railway, the second largest of the ‘Big Four’ railway companies in the 1920s. A year later, it was renumbered and renamed after the London to Edinburgh daily 10am rail service, selected to appear at the British Empire Exhibition.

The exhibition brought the steam service to fame, and in 1928 it hauled the first ever non-stop London-Edinburgh service with a shorter journey time of eight hours. In 1934, the Scotsman set a new standard for rail locomotives after reaching a speed of 100mph.

After railways were nationalised in 1948, it was renumbered once again and painted Brunswick Green. The National Railway Museum eventually bought the engine in 2004, helped by a £1.8m grant from the National Heritage Memorial Fund.

The loco will now run from London to York and its inaugural main line run will be the opening event for the National Railway Museum’s ‘February Flying Scotsman Season’.

Bob Gwynne, curator of collections and research at the museum, said that it will run from York to London once it has built up the sufficient mileage (1,000 miles).

Riley & Son Ltd will manage the Flying Scotsman’s operations for the first two years of its services in a commercial partnership with the museum. This will include ongoing maintenance reliant on the company’s knowledge of both the Scotsman and steam locomotive upkeep in general.

(Image: c. Phil Sangwell) 

Tell us what you think – have your say below or email [email protected]

Comments

Terry K   21/07/2015 at 12:11

If they are planning runs from London to York after 2018 the engine will need to be fitted with ERTMS because there will be no lineside signals from Wood Green to Peterborough.

Henry Law   21/07/2015 at 13:41

Time to retire the old lady in a place of honour. You could build at least two new ones for £4 million, possibly more.

Richard.Zrh   06/10/2015 at 19:27

"The most complex restoration of a steam locomotive ever undertaken" Surely not. It's definitely taken a long time (and cost a lot) but this was due to mistakes being made in the initial years with work having to be done twice. Complex? In engineering terms, No; but you may have a point if you're writing about the management practices employed on the job. The Duke of Gloucester rebuild was far more complex, owing to much of the valve gear being missing and having languished in salt laden air for more than a decade. Henry Law: you might be a bit on the light side. Tornado cost best part of £5m, so you might get one new A3, but never two, for the £4m.

Add your comment

rail technology magazine tv

more videos >

latest rail news

HS2 Ltd: Five tech firms join Innovation Accelerator initiative

11/09/2020HS2 Ltd: Five tech firms join Innovation Accelerator initiative

HS2 Ltd have announced today (11 Sept) the first five revolutionary tech firms that will join HS2 Ltd’s Innovation Accelerator programme. ... more >
Network Rail publish Decarbonisation Plan

11/09/2020Network Rail publish Decarbonisation Plan

Network Rail have released their interim Traction Decarbonisation Network Strategy, illustrating its preliminary recommendations for decarbonisin... more >
Trains kept moving by AWC despite damaged overhead wires

11/09/2020Trains kept moving by AWC despite damaged overhead wires

Avanti West Coast have taken an unlikely option to allow their timetable to run, without delays, despite damaged overhead wires. The operato... more >
GTR spreads messages of support on Suicide Prevention Day

10/09/2020GTR spreads messages of support on Suicide Prevention Day

As today (10 Sept) mark the annual World Suicide Prevention Day, Govia Thameslink Railway (GTR), have revealed ‘Affirmation Art’ clus... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the TOC, gives RTM an update on the innovative scheme... more > more last word articles >

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >

the sleeper's daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News