Latest Rail News

01.03.07

PB to project manage Mumbai Metro development

The planned development of an 11.5 km-long Metro rail system in Mumbai is to be project managed by leading international engineering consultancy Parsons Brinckerhoff (PB), in joint venture with Systra (SA France). Reliance Energy Ltd has appointed the PB led JV following the award of a 35-year concession to construct, operate and maintain the Versova-Andheri-Ghatkopar (VAG) Metro rail.

The PB led JV will provide project and construction management services, engineering services, including civil, structural, systems, trackwork and power supply design.

The 11km route, to include 12 elevated stations, is the first phase of the Mumbai Metro rail project. The 12 stations will be at Versova, D.N. Nagar, Azad Nagar, Andheri, Western Express Highway, Chakala, Airport, Marol Naka, Saki Naka, Subhash Nagar, Asalpha Road and Ghatkopar.

When complete the VAG route will have a carrying capacity of 600,000 people per day with a commuting time of 21 minutes. The current commuting time between Versova and Ghatkopar is 70 minutes. The double line elevated standard gauge metro rail line will include a depot for stabling and maintenance of the rolling stock, with a single line entry 500m long and 5km of track within the depot.

The entire Mumbai Metro rail system has a planned route of 146.5km long. It will be made up of nine lines, 32.5km of which will be underground, with 114km on elevated rails.

Tell us what you think – have your say below, or email us directly at [email protected]

Comments

There are no comments. Why not be the first?

Add your comment

Rail industry Focus

View all News

Comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >

Most Read

'the sleepers' blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s... more >
read more blog posts from 'the sleeper' >

Interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he would not rule out his organisation issuing future r... more >
Advancing the rail industry with management degree apprenticeships

08/05/2019Advancing the rail industry with management degree apprenticeships

In answering the pressing questions of how current and future generations of managers can provide solutions to high-profile infrastructure projects across the UK, Pearson Business School, part of... more >