The Sleeper's Blog

29.06.20

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network.

Rail travel forms an important part of any national transport network for both passengers and freight. As such, it needs to be safe and reliable and these features depend on timely maintenance being completed to a high standard.

The rail industry depends on a number of trusted suppliers who are expected to deliver the highest quality repairs. The RISAS uses independent auditors to assess suppliers and all their systems, procedures, resources and training to ensure they meet all the criteria for the successful delivery of components and services to the industry.

Sulzer’s Nottingham Service Centre boasts a Rail Competence Centre which successfully completed the independent audit and been awarded the RISAS accreditation, which covers alternators, generators, rotating rectifiers, any type of DC traction motors, fans and blowers.

The audit is a comprehensive assessment that covers the entire process of supplying components to the rail sector. From the supply chain to the procedures, resources and competencies, including training, every aspect is assessed to ensure it meets the stringent industry standards.

RISAS Image 1

Image Caption: Sulzer’s expert engineers are RISAS approved to cover a wide range of rail components

The RISAS accreditation is awarded by product line as well as to a particular location or business. In Sulzer’s case the entire Nottingham facility, which encompasses both the main workshop and the rail centre, are covered because some of the larger traction motors are repaired in the general maintenance centre.

Mark Taylor explains: “Many tier 1 contractors who support the rail sector will take the RISAS accreditation as a good indicator to the quality of work that can be expected from the supplier, avoiding the need to carry out their own audits. This saves time and money for all those involved in the tender process and ultimately reduces the time to complete the repair project.”

This is the first RISAS accreditation for Sulzer, which is looking to expand the number of services centres that hold this certification. Currently the facilities in York and Avonmouth, which also carry out work for the rail sector, are in the process of gaining RISAS accreditation.

Mark concludes: “Having achieved the RISAS accreditation for so many components, it is a relatively simple task to include additional assemblies if required. Say, for example, a customer needed some pump repairs to be delivered under the scheme; we can arrange to be audited for the new component before the pump repairs are completed, ensuring the project is delivered to the exact requirements of the customer.”

RISAS Image 2

Image Caption: Sulzer’s Rail Competency Centre in Nottingham offers repair and engineering expertise to the rail industry

 

Case Study: Design changes address issues with rotating rectifiers

An issue with the diode ratings and the lack of surge protection in one design of rotating rectifier has been experienced by several rail operators, causing trains to be taken out of service. Working with its rail industry customers, maintenance engineering specialist Sulzer has recognized the common fault and developed a solution to the issue. The result is a faster repair that is now reducing the downtime for affected trains and helping to maintain scheduled services.

Mark Taylor, Service Centre Manager at Sulzer’s Rail Competency Centre in Nottingham, looks at how Sulzer has resolved one of the main reliability issues in UK passenger trains.

Trains play a key part in our lives. Commuters and travellers alike rely on trains to get them to their destinations on time. Whether this is for work, visiting friends and family or going on holiday, this service depends on trains that are reliable. One of the key components onboard a train is the auxiliary generator which incorporates a rotating rectifier. The alternator powers the auxiliary circuits such as lighting, battery charging and air conditioning. 

RISAS Image 3

Image Caption: : The improved design for the rotating rectifier will almost completely eliminate failures

 

However, when this well-known issue with the rotating rectifier occurs, the train must be taken out of service and there is a considerable mechanical and electrical task involved in repairing and getting the train back to operational status. In order to ensure scheduled services for passengers, the hope is that the proposed solution will be adopted by more companies so that the impact of this issue can be minimized.

 

Impact assessment

The alternators are located within the bogie assemblies of the trains and they are responsible for regulating the auxiliary power for the trains. The rotating rectifier is an integral part of the brushless alternator and any faulty component means that the engine has to be taken out of service for repairs. Hence when they fail, service is disrupted.

Due to their location, the repair can be a time-consuming task. With that said, it is easier to replace the rectifier than remove the entire alternator, so many train operators, or their maintenance contractors, are holding several rectifiers in stock.

However, as maintenance engineers correlated information, it became clear that the issue is not related to time in service. The failures can occur at any time, which means a recently installed component has the same chance of failing as an old one. It is this repetitive, but still random, nature of the issue that is causing so much concern for the rail operators because even shortening a planned maintenance schedule will not affect the reliability of these components.

 

Root cause analysis

Sulzer’s experts in Nottingham conducted an investigation into the rectifier failures and proposed an improved design that would be fully interchangeable with the original. With decades of experience in rail engineering, Sulzer’s service centre in Nottingham is renowned as a centre of excellence for the rail sector.

The investigation into rectifier reliability discovered that the current rating of the diodes appeared to be inadequate, particularly for transient and field forcing conditions. In addition, the mechanical clearances between the diodes and the earthed hub were insufficient, offering the potential for short-circuit failures. The engineers also found that there was no surge or spike suppression fitted, which could lead to diode failures due to surges transmitted to the rotor caused by external faults or load changes.

The engineers proposed a design that used higher rated devices as well as the addition of transient suppression to protect against electrical surges. The new rectifier also has increased mechanical clearances to prevent short circuit failures.

 

Design improvements

Typically, rail operators expect this type of component to perform without any maintenance for four years, after which the regular service routine will instigate an inspection. Sulzer’s new design of rectifier is expected to far outlast the current equipment, in fact, there is very little reason for it to fail at all.

This is just one example of Sulzer’s engineering expertise being applied to the rail industry. Another notable project involves the repair or redesign of automatic voltage regulator (AVR) cards, which also pose a considerable reliability issue within the industry.

Ultimately, Sulzer’s aim is to work with rail operators and their maintenance providers to develop solutions that improve reliability and efficiency, making the business of operating trains more cost-effective. This in turn will make more trains available for operation, helping to ensure that we all reach our destinations on time.

 

RISAS Image 4

Image Caption: Sulzer’s expertise in the design of electronic components improves reliability for customers

Comments

There are no comments. Why not be the first?

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

Welsh Government call for backing of South Wales Main Line major upgrade

10/09/2020Welsh Government call for backing of South Wales Main Line major upgrade

Plans for new train services and stations in south-east Wales have been outlined by the Welsh Government, who have called on the UK Government to... more >
Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the Wessex route in the South o... more >

editor's comment

23/01/2018Out with the old...

Despite a few disappointing policy announcements, especially for the electrification aficionados amongst us, 2017 was, like Darren Caplan writes on page 20, a year generally marked by positive news for the rail industry. We polished off the iconic Ordsall Chord (p32), hit some solid milestones on Thameslink (p40), progressed on ambitious rolling stock orders (p16), and finally started moving forward on HS2 (p14) ‒ paving the way for a New Ye... read more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the TOC, gives RTM an update on the innovative scheme. Recognising that young people are more likely to take a risk trespassing on railway tracks, CrossCountry and the Scouts have come together to encourage Britain’s younger generations to be... more > more last word articles >
board2

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >
Advancing the rail industry with management degree apprenticeships

08/05/2019Advancing the rail industry with management degree apprenticeships

In answering the pressing questions of how current and future generations of managers can provide solutions to high-profile infrastructure projec... more >
Women in rail - is the industry on the right track?

12/03/2019Women in rail - is the industry on the right track?

RTM sits down with Samantha Smith, sole female member of the TransPennine Route Upgrade Alliance Leadership Team, to find out more about encourag... more >