London Underground and TfL

12.12.12

First of the S7 stock begins operations to Barking

The first of the new S7 stock on the Hammersmith & City line is now running all the way to Barking.

Nigel Holness, director of Operational Change and Upgrades at London Underground, said: “This is great news for our customers in the east end of London. The trains are longer, walk-through and in the summer customers will be able to benefit from the air conditioning too. 

“It is the first of 53 new trains that will operate on the Hammersmith & City and Circle lines and will start rolling out in earnest from spring next year.” 

Photos can be seen here.

The fully walk-through trains allow better access for passengers and provide 17% more capacity on the Hammersmith & City and Circle lines. The new seven-car rolling stock offers more capacity then the previous six carriage trains, relieving pressure on the Underground network.

Braking is provided by Knorr Bremise’s EP2002 system, and although the S Stock is using the tripcock train protection system for now, by 2018 this will be upgraded thanks to the installation of Bombardier’s Cityflo 650 signalling system.

The new trains will also have automated visual displays and station announcements, CCTV, wheelchair access, wider doors and walkways, lower passenger alarms and a smaller gap between the train and the platform.

S7 Stock trains are 117.5 metres long, with a capacity of 865 passengers, based on four passengers per m2.

The interiors offer a much better experience for passengers. As one enthusiast put it: “What was noticeable yesterday was riding the new LO link on a 378 and changing to the S7 at Whitechapel, how so very different the train interiors are. From the cramped, low windows – some with fixed openers, some with destination equipment obsuring, on the 378 – to the tall unobstructed windows on S Stock, which you can quite easily stand by the doors and look out.”

Last month, more than half of the Metropolitan line S Stock was returned to Bombardier’s Derby facility for modifications, at Bombardier’s cost. They are having wheel bearing adjustments, and drivers have also complained about the in-cab environment.

Tell us what you think – have your say below, or email us directly at [email protected]

(Image copyright TfL.) 

Comments

There are no comments. Why not be the first?

Add your comment

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the Wessex route in the South o... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passengers in the West Midlands.... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across t... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >