Track and signalling

27.02.15

Government admits ‘uncertainty’ over TransPennine electrification

Today’s Invitation to Tender for the TransPennine Express franchise admits that there is “uncertainty about the timing and outputs” of the TransPennine electrification and associated capacity and line speed upgrades.

The Department for Transport originally announced the scheme in November 2011, but unclarity over timing and costs remains, while Network Rail says that “development of all Northern Programme Yorkshire schemes [which includes TransPennine electrification] remains on hold pending confirmation of scope with the DfT”.

This follows the submission to the DfT of the results of a 12-week study into journey time, capacity and performance improvements, which was handed over on 30 January but has not been made public.

In its November 2014 major projects update, Network Rail’s estimated delivery completion date for the programme was July 2020 – but the newest version of the document has dropped this entirely, saying that the date is “to be announced”. The anticipated final cost of the entire Northern Programme Yorkshire remains £440m.

Today’s ITT notes: “During the franchise term, it is envisaged that the electrification of the north TransPennine route will be undertaken along with a number of other changes to infrastructure capability, on the north TransPennine route and elsewhere, including increases in capacity and line speed (‘Future Enhancements’), over and above those assumed for December 2017.

“However, the nature of planning timescales means that there is currently uncertainty about the timing and outputs of these changes. Therefore, in order to ensure consistency of bid responses, Bidders are required to bid on the basis (for bid purposes only) that the Future Enhancements do not occur during the Core Franchise Term and the Extension Period, with mechanisms in the Franchise Agreement to deal with the implications when the timing and outputs of the Future Enhancements are known.”

The Office of Rail Regulation (ORR) has already confirmed that TransPennine electrification is “unlikely to be deliverable” by the original 2018 completion date.

The ITT also says: “For the purpose of identifying the maximum size of [diesel] fleet that might become surplus, Bidders are to assume that the only requirements in the TSR (train service requirements) that cannot be operated with electric traction would be for services operating on the south TransPennine route between Manchester Airport, Sheffield and Cleethorpes, though depending on future circumstances additional diesel stock may need to be retained for operation of passenger services on routes which are not electrified (e.g. for services to Hull, Middlesbrough and/or Scarborough).”

Comments

Lutz   27/02/2015 at 17:48

It would seem that NR, as a public-sector entity, is not up to the job; I would suggest that all new project work be taken from NR and put out to tender to those that can, leaving NR with the operations and maintenance only - provided it is up to it.

Lutz   27/02/2015 at 17:50

P.S. You may want to adjust the time-out on the comment submission to allow time to both read the article and write a comment :)

John Gilbert   06/03/2015 at 11:24

The word uncertainty is used. But does this mean uncertainty as to whether the electrification will be done AT ALL, or does it mean that it will be done more slowly? There is a big difference!!

RTM   06/03/2015 at 11:27

Hi John, we tried to be clear in the opening paragraph - "“uncertainty about the timing and outputs”

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the Wessex route in the South o... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passengers in the West Midlands.... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >