Railway safety and crime

22.05.15

Runaway train crashes into a set of coaches

An unattended train was allowed to run away for almost two miles before crashing into a set of coaches, according to a report from Rail Accident Investigation Branch (RAIB).

No one was injured in the accident but significant damage was sustained to the vehicles involved.

The crash happened on 12 May 2014 when the train, made up of a 145-tonne Class 37 diesel-electric locomotive coupled with a Mk 1 Post Office Sorter, ran away for around 1.8 miles before colliding with a set of unattended coaches.

The collision occurred about 450 metres south of Loughborough Central station, located on the Great Central Railway, a heritage line that had no services for public use being operated on the day.

The train that ran away had been left unattended on a main line opposite Quorn signal box. The railway at Quorn is on a gradient which descends towards Loughborough.

532 Capture

RAIB’s investigation found that, before the train was left unattended, the air brakes on the locomotive had been applied by the driver and a single wheel scotch had been positioned against one of the locomotive’s wheels by a member of staff. The handbrakes on the locomotive were not applied and the coach was not secured with either brakes or a wheel scotch.

The investigation concluded that the train ran away because “the wheel scotch was positioned against the locomotive’s wheel in a way which made it ineffective”.

“The RAIB determined that the handbrakes on the locomotive, had they been used, would have provided sufficient braking force to have held the train.

“The driver did not apply the locomotive’s handbrakes because he believed that they were not effective on this class of locomotive and that the wheel scotch would provide sufficient braking force, should the pressure in the air braking system leak away.

“The driver may also have been influenced by the prevailing practices on the railway which related to the use of handbrakes,” the report said.

It added: "The RAIB found that checks by the Great Central Railway's managers did not detect the full-extent of the unsafe and non-compliant practices.

"The investigation also found that some of the rules relating to the way in which rail vehicles were to be left unattended were inconsistent and potentially unclear."

RAIB has made a number of recommendations to Grand Central Railway in an effort to prevent further incidents.

Tell us what you think – have your say below or email [email protected]

Comments

Andrew Sharp   26/05/2015 at 14:30

It happened over a year ago, so why the present tense? And the story is about the cause, not the fact. My point - the headline is unduly sensational. Appropriate for the Daily Mail but not for Rail Technology Magazine.

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the Wessex route in the South o... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passengers in the West Midlands.... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >