One of the country’s most hit railway bridges to reopen

One of the country’s most hit railway bridges to reopen

A Cambridgeshire bridge has reopened this week after one of the country’s most hit railway bridges was repaired and strengthened, following a crash that occurred in 2019.

In October 2019, a vehicle hit the bridge on Stonea road, which is part of the Ely-Peterborough rail line. At the time the bridge was just over 2m in height and this was the thirteenth time it had been hit that year. The bash caused significant damage which meant the road underneath had to be closed to keep everyone safe.

Network Rail’s engineers have worked on a repair that involved the design and installation of a new protection beam, designed to withstand future bridge strikes, making the bridge stronger than before.

Stonea Bridge

This extra protection aims to lessen disruption to rail and road traffic in the event of another strike. The repair work was completed at the beginning of the month (February) and Cambridgeshire County Council has updated the signage with its new height of 2 metres – 10cm lower than before, owing to the new protection beam.

While the new bridge is stronger, motorists are urged to check the height of their vehicle to avoid any further strikes.

Ellie Burrows, Network Rail’s Route Director for Anglia, said: “The disruption this incident caused shows why it’s so important for motorists to know the height of the vehicle they are driving. We have carried out extensive works to make the bridge stronger, but this doesn’t mean that drivers can be complacent. Motorists should do their bit too and wise up, size up.”

Stonea bridge completed side shot

Cllr John Gowing, member for March South and Rural at Cambridgeshire County Council, said: “I’m pleased to see the road has reopened as this will reduce traffic in the area. The new signage will provide a warning to drivers on the approach to the bridge and help prevent further accidents.

“I do understand that residents may still have some concerns and I’d urge drivers of larger vehicles who use the route to be aware of the bridge, read the signs and check the size of your vehicle.”

Images: Network Rail 

Transforming Track Maintenance & Safety

RTM APR/MAY 21

Transforming Track Maintenance & Safety

Delve into the rich range of contributions in our April/May 2021 edition of RTM, covering everything from automated video technology on trains to detect lineside obstructions and risks to the plans for Northern Powerhouse Rail (NPR) and hear from the team behind the new Piccadilly line tube stock

Videos...

View all videos
RTM365 Online Festival, Equality, Diversity & Inclusion

RTM365 Online Festival

Equality, Diversity & Inclusion
16th June 2021

On the 16th June, RTM365 will bring together industry leaders to share their knowledge on how to start attracting a diverse workforce, 

how driving cultural change within your organisation can help develop and retain new skills,

the investment in creating a rail network accessible for all and

how to ensure your business meets EDI standards in procurement to win new business. 

Podcast

The Green Rail Revolution

Maria Machancoses, Director of Midlands Connect discusses the importance of HS2 to the Midlands and the UK, their collaborative work with the Department for Transport, and how we need to embrace the railways again.

More articles...

View all