HS2

19.09.16

GTR seeks views on ‘complete redesign’ of 2018 timetable with self-contained routes

Govia Thameslink Railway (GTR) has opened a consultation on a new timetable following the opening of the expanded Thameslink network.

GTR operates the UK’s largest rail franchise, but also has the worst PPM in the country after experiencing persistent delays, especially across Southern.

It promised the new timetable would improve reliability on Southern inner London services and lead to 80% more peak-time seats between Blackfriars and St Pancras International across central London, and 19% extra seats through longer Thameslink trains from Brighton.

Phil Hutchinson, who is leading the timetable development and consultation, said: “We are proposing a complete redesign of the timetable by looking at which journeys are most important to passengers.

“We are creating more capacity and new cross London routes with connections to Crossrail and more punctual and reliable services. Operationally, each route would be self-contained so that if a problem occurs it does not affect other routes.

“We want passengers and stakeholders to help us shape their future train service so we are consulting, we think, earlier than any train operator has before. This is a real opportunity for passengers and stakeholders get involved in an open, honest and transparent conversation about what the train service should be in the future.

“This is about creating better connections and more capacity. It’s a once-in-a-generation opportunity to restructure the timetable to give passengers more trains and the much better reliability we all want.”

On Southern, GTR promised to make routes more self-contained and easier to operate, reducing the ‘domino effect’ from delays.

Littlehampton, Horsham and East Grinstead services to London Bridge will transfer to Thameslink, and continue through central London to Bedford and Peterborough, with connections to St Pancras International and Luton Airport.

Other changes will include an all-day service between Epsom, Sutton, West Croydon & London Bridge, 10-carriage trains on Surrey’s Caterham & Tattenham Corner routes, and trains from Redhill to London Bridge.

However, Mick Cash, general secretary of the RMT union, which has led strikes on Southern throughout the summer, argued: “Passengers don’t want to be consulted on how services may improve in almost two years’ time. They want action now to end the daily chaos to their journeys.”

Network Rail has now opened two-thirds of the new concourse at London Bridge, after major construction works helped cause the delays on GTR.

On Thameslink, meanwhile, there will be new services across central London, all-day services between Maidstone East and Cambridge with connections to Crossrail, and more frequent services at most stops between London and Bedford.

Improvements on Great Northern will include new direct services from Cambridge and Peterborough to Gatwick Airport and beyond and additional direct links to Maidstone from Cambridge.

The consultation is open until 8 December. The timetables for all of GTR’s franchises can be viewed here:

GTR has also introduced a new fleet of Class 700s (pictured), which seat up to 1,754 passengers, to deliver the extended services.

(Image c. GTR)

Have you got a story to tell? Would you like to become an RTM columnist? If so, click here.

 

 

 

 

Comments

Andrew Gwilt   20/09/2016 at 00:33

New timetables for Thameslink would improve better journey times and with more Class 700's being delivered and some are already in service will soon improve better journeys and with Class 700's that are used on Bedford-Brighton, Bedford-Three Bridges, London Bridge-Three Bridges, Luton-Wimbledon, Luton-Sutton, St. Albans-Sevenoaks and other services that Thameslink will provide with Sevenoaks and Orpington services that will see Class 377/2/5's being used unless 8-Car Class 700's are provided for those routes and sometimes 12-Car Class 700's may also be used on those routes.

Jake   21/09/2016 at 14:23

Someone please stop / ban this Gwilt person and their stupid, pointless, factually incorrect comments that serve no purpose to anyone.

Rail Realist   23/09/2016 at 12:05

The best way for the RMT point to be achieved is for them to stop the pointless strikes that has caused chaos all summer and looks set to continue into the autumn and winter. Come on RMT, get real and move with the times; DOO has been around for decades, so stop wingeing about it being unsafe

Andrew Gwilt   24/09/2016 at 00:37

@Jake. So you want me banned!! Get a life will you.

Andrew Gwilt   24/09/2016 at 00:38

I was only stating the obvious ok. So do ignore me then Jake. End of.

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

HS2 Ltd: Five tech firms join Innovation Accelerator initiative

11/09/2020HS2 Ltd: Five tech firms join Innovation Accelerator initiative

HS2 Ltd have announced today (11 Sept) the first five revolutionary tech firms that will join HS2 Ltd’s Innovation Accelerator programme. ... more >
Network Rail publish Decarbonisation Plan

11/09/2020Network Rail publish Decarbonisation Plan

Network Rail have released their interim Traction Decarbonisation Network Strategy, illustrating its preliminary recommendations for decarbonisin... more >
Trains kept moving by AWC despite damaged overhead wires

11/09/2020Trains kept moving by AWC despite damaged overhead wires

Avanti West Coast have taken an unlikely option to allow their timetable to run, without delays, despite damaged overhead wires. The operato... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >