Inbox

19.06.15

Loco issues contribute to poor Caledonian Sleeper PPM figures

Issues with new locomotives have contributed to the low PPM figures posted by Caledonian Sleeper since Serco took over the franchise, according to the operator’s performance director, writes Sam McCaffrey.

Caledonian Sleeper’s latest PPM figure, for Period 2 (3 May to 30 May 2015), is 91.7%, which is significantly lower than the 98.2% posted a year ago when the services were a part of ScotRail. However, it is an improvement on the 88.8% from April.

David Simpson, performance and safety director at Serco Caledonian Sleeper, told RTM that it’s usual for the numbers to fluctuate from period to period, especially as the franchise operates so few services.

“With all the small numbers it can only take a few small incidents to quickly knock trains beyond the PPM targets, and I think that’s what happened in Periods 1 and 2 since we took over from ScotRail,” he said.

Last period, 15 Sleeper trains missed their PPM targets, with the causes evenly split between  Network Rail issues, delays caused by other operators and Serco’s own problems.

Of the operator’s own problems, the one contributing most to missed PPM targets is issues with the new Class 92 locomotives, which haul the Mark 2 and Mark 3 British Rail coaches.

When it took over, Serco elected to move on from DB Schenker, which had been hauling the Sleeper coaches for more than a decade, and awarded the contract to GB Railfreight instead. This also meant a switch from Class 90s to GB Railfreight’s Class 92s and – from October on the non-electrified sections – a switch from Class 67s to Class 73/9s.

Under the new arrangement, refurbished Class 92 dual-voltage electric locomotives haul services south of Edinburgh and Glasgow, and failures with these have contributed to 20% of Caledonian Sleeper’s total missed PPM targets.

The problem with the locos is caused by two pieces of safety equipment meant to detect stray electrical currents and protect against their impact.

Simpson said: “The limits [for] those two pieces of kit are set quite tight, for good reason, and what we’ve found is that when the locomotives travel through neutral sections in the OLE [overhead line equipment] some of that protection has been tripping out, because it has recognised interface issues between the OLE and the loco. The procedure there is straightforward – the driver can reset the kit and travel on as normal – but that can cause delays and has and caused PPM miss at destination.”

The Class 92s were built for use through the Channel Tunnel and Serco believes that the levels at which this equipment is set is higher than is necessary for use on the main line network. The company is working with GB Railfreight at relaxing the level at which the protection is set.

“Now that has to go through Network Rail to be validated, which is absolutely right and proper, but there is a strong case for that and it should give us some additional resilience as we go forward,” Simpson said.

He added that so far in Period 3, as of 17 June, they have had no PPM failures due to the issue so it appears it may be resolved.

For more from our interview with David Simpson, performance and safety director at Serco Caledonian Sleeper, see the next issue of RTM.

(Picture by: Train Photos)

Tell us what you think – have your say below, or email us directly at [email protected]

Comments

There are no comments. Why not be the first?

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

HS2 Ltd: Five tech firms join Innovation Accelerator initiative

11/09/2020HS2 Ltd: Five tech firms join Innovation Accelerator initiative

HS2 Ltd have announced today (11 Sept) the first five revolutionary tech firms that will join HS2 Ltd’s Innovation Accelerator programme. ... more >
Network Rail publish Decarbonisation Plan

11/09/2020Network Rail publish Decarbonisation Plan

Network Rail have released their interim Traction Decarbonisation Network Strategy, illustrating its preliminary recommendations for decarbonisin... more >
Trains kept moving by AWC despite damaged overhead wires

11/09/2020Trains kept moving by AWC despite damaged overhead wires

Avanti West Coast have taken an unlikely option to allow their timetable to run, without delays, despite damaged overhead wires. The operato... more >
GTR spreads messages of support on Suicide Prevention Day

10/09/2020GTR spreads messages of support on Suicide Prevention Day

As today (10 Sept) mark the annual World Suicide Prevention Day, Govia Thameslink Railway (GTR), have revealed ‘Affirmation Art’ clus... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the TOC, gives RTM an update on the innovative scheme... more > more last word articles >

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >

the sleeper's daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News