HS2

25.07.16

HS2 accused of not listening to Camden residents over ‘paltry’ reduction in bridge height

HS2 Ltd’s new plans for the Hampstead Road Bridge in Camden have been criticised by the leader of Camden Council, who said residents weren’t consulted about the changes.

As part of the construction of the high-speed rail, HS2 Ltd is going to narrow the A400 bridge and increase its height by 4.7m in the road level at either end of the bridge and utility diversions across the Ampthill estate.

In December, it began a study into ways to reduce the needed height increase in order to reduce the impact on residents, and came to the conclusion that the preferred solution was keeping the existing design, but reducing the proposed height increase by 0.5-1m by using higher grade steel and other design adjustments.

But Cllr Sarah Hayward said: “It is unacceptable that HS2 Ltd has once again made a decision without consulting our residents whose lives will be so affected by this disruption.

“We were prepared to keep an open mind and had expected a much more thorough examination of all possible options to ensure Camden residents and businesses got the best possible outcome, with the least disruption. The paltry reduction in the height suggested by HS2 Ltd brings little relief from the impact of the original proposals.”

She added that Camden residents were not involved in the consultation on the options.

Her remarks mark another blow for HS2’s community engagement strategy, which is under review by the DfT following sharp criticisms from the Public Administration and Constitutional Affairs Committee.

Cllr Hayward has also written to Chris Grayling, the new transport secretary, saying that Camden Council opposes the plans for HS2 as they stand and warning that they will bring “decades of destruction and blight to our borough”.

Camden Council is also petitioning the House of Lords for more measures to reduce the impact of HS2 on the borough, which is home to London Euston station – beyond the package of measures agreed with HS2 and DfT late last year.

The other options considered were the realignment of the Hampstead Road Bridge 15m away from Euston Station, providing two adjacent box girder bridges and keeping the existing bridge above Network Rail tracks, but providing an extension over HS2 tracks.

In a joint statement, Transport for London (TfL) and the London Borough of Camden (LBC) said: “TfL and LB Camden’s position is that further work on the options should be carried out before any final decision is taken, including undertaking engagement with residents.”

Network Rail agreed that further work on the other options was needed and the option of providing an extension to the existing bridge remained “of significant interest”, although it agreed that the benefits of all the options were “unproven”.

Martin Frobisher, Network Rail’s route managing director for London and the north west, recently told the Transport Select Committee that although he thought the project was “really worthwhile”, Network Rail is anticipating a “difficult period” because of the disruptions it would cause across the rail network.

RTM contacted HS2 Ltd for a statement but it did not respond at the time of publication.

3.45pm UPDATE

Richard Pain, HS2's media relations manager, said: “Following a comprehensive review of the options for Hampstead Road Bridge, we have found that lowering the bridge by up to one metre more than currently planned is the preferred choice. This option best balances community and pedestrian considerations while maintaining flexibility for Network Rail. All key parties including London Borough of Camden, TfL, Network Rail and DfT had an input into the study through collaborative workshops.”

(Image c. Rui Vieira from PA Wire and Press Association Images)

Have you got a story to tell? Would you like to become an RTM columnist? If so, click here.

 

 

 

Comments

There are no comments. Why not be the first?

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the Wessex route in the South o... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passengers in the West Midlands.... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >