Rail service improvements and disruptions

17.02.20

Wherry Lines see introduction of new signalling system

130 years of signalling history came to an end today (Feb 17th) on the Wherry lines alongside the reopening of the Norwich to Yarmouth line.

This follows completion of work to introduce a new computerised signalling system, improving dependability of train services.  

A section of the East Suffolk line from Beccles to Lowestoft also reopened today.

Having been shut since February 1st engineers have switched the signalling system over from the old, Victorian mechanical signals which have been in place for over 130 years, to the modern computer-based system.

Work on the Norwich to Yarmouth line took place at level crossings including Brundall, Lingwood Chapel Road and Station Road to put in place full barriers and crossing lights along with upgrade work to numerous user worked crossing such as Acle Marshes to develop crossing safety.

New signals were also powered up along the lines and signalling engineers moved the last of the local signal box controls to Colchester as part of the modernisation programme.

Signalling work has also taken place on the Norwich to Lowestoft line, as well as upgrading the track at Lowestoft and renewal points outside of Oulton Broad North, allowing trains to be directed from one track to another.

Brundall level crossing 

The reopening of the Norwich to Yarmouth and Beccles to Lowestoft lines will allow engineers to now focus on delivering just over three kilometres of track renewals at Hassingham, improving the journey quality for passengers.

Conclusive work is taking place at Cantely, Strumpshaw and Oulton Broad North level crossings to bring them into use when the Norwich to Lowestoft line is expected to reopen on 24 February.

Network Rail’s route director for Anglia, Ellie Burrows, said: “The completion of the re-signalling work is a significant milestone for the history of the Wherry lines. and we are in a really good position to complete the track works at Hassingham and reintroduce train services on the Norwich to Lowestoft line on 24 February.”

Director at engineering consultancy Atkins, Scott Kelley, said: “Working closely with Network Rail and our supply chain partners, we look forward to completing the transformation of this important route which will serve communities right across Anglia.”

Images: Network Rail 

Comments

There are no comments. Why not be the first?

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Se... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the We... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passeng... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >