Rail service improvements and disruptions

26.01.15

Burst water main brings Thameslink to a halt

Flooding from a burst water main has caused major disruption for Thameslink services over the weekend and has left the operator unable to run any services between Farringdon and London St Pancras today.

On Friday, a burst water main near Farringdon flooded the railway tunnels between Farringdon and St Pancras. Thames Water attempted to fix the main, but the leak continued to flood the tunnels throughout Saturday and into Sunday.

Immediately after the leak on Friday, Thameslink was still able to operate some services through the tunnel, but there were major delays and as the flooding worsened all services had to be halted.

A tweet from Thameslink this morning said that approximately 28,000 litres of water was being pumped out an hour but there was an estimated 250,000 litres left to move.

As of 3pm Sunday Network Rail reported there was still water one metre deep in the tunnels. There are concerns the flooding may have caused damage to safety equipment and infrastructure.

A spokesperson for Govia Thameslink Railway, which operates Thameslink services, said: "The disruption caused by the burst Thames Water water main near Farringdon has been hugely frustrating for passengers and railway staff alike but in the interests of safety we have to follow the advice of Network Rail and not run through the area.

"We are doing all we can to help passengers on our reduced service with alternative transport arranged with other operators and rail replacement buses where possible. However, on a working weekday, a problem like this is bound to cause significant disruption and we can only apologise.”

Thameslink tunnels 25 Jan 2015 no3

In addition to no services running between Farringdon and St Pancras, there is also reduced service on all other Thameslink routes.

A Thames Water spokesman said: "We're really sorry to commuters who have had disruptions to their journeys today. And we would also like to apologise to any of our customers who have experienced interruptions to their water supply.

“We have been working around the clock this weekend, with help from Thameslink, Network Rail and Transport for London, to fix the leak as fast as possible while keeping our customers in supply at the same time.”

Tell us what you think – have your say below, or email us directly at [email protected]

Comments

There are no comments. Why not be the first?

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Se... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the We... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passeng... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >